The Public Authority for Roads and Land Transport announced the opening of a part of the Ring Road 6.5 for those coming from Airport Road “Route 55” towards Abdullah Al Mubarak area, with a length of 2.5 km, and lanes either side.
The authority said the opening of the road to traffic is done in coordination with the General Traffic Department, within the framework of the partial openings policy that the authority follows in its projects to facilitate traffic on the roads, reports a local Arabic daily.