The Public Authority for Housing Welfare announced it has designed a solar energy system for 96 buildings in Al-Mutla’a city, which has a production capacity of 8,402 megawatts. This comes in the implementation of the objectives of the country’s development plan and the sustainable development goals of the United Nations.

Al-Rai quoting Housing sources indicated it has implemented the solar energy system in the residential buildings in West Abdullah Al-Mubarak, East Taima, and Jaber Al-Ahmad.

It pointed out that it has completed the installation of the solar energy system in 90 buildings in the West Abdullah Al-Mubarak area with a production capacity of 7.514 megawatts. It said the solar panels that will be installed in East Taima and Jaber Al-Ahmad will reach between 15 and 20 percent of the consumption rate of each building; saying the aim is to rationalize consumption and contribute to reducing the electrical burden on the national grid.


Read Today's News TODAY... on our Telegram Channel click here to join and receive all the latest updates t.me/thetimeskuwait