FeaturedKuwait News

Kuwait’s Al-Zour Refinery set for massive KD 130 million overhaul

The refinery is considered one of the most prominent strategic projects in the local oil sector and a key pillar of Kuwait Petroleum Corporation’s 2040 strategy.

With a refining capacity of approximately 615,000 barrels per day, the Al-Zour Refinery accounts for 43.5% of Kuwait’s total refining capacity.

The Al-Zour Refinery is preparing for a major periodic maintenance project with an estimated budget of KD 130 million, sources revealed to Arabic daily Al-Anba.

The Kuwait Integrated Petroleum Industries Company (KIPIC) has reportedly divided the contract into two parts—Block 1 valued at KD 57.45 million and Block 2 at KD 71.79 million.

The Al-Zour Refinery is considered one of the most prominent strategic projects in the local oil sector and a key pillar of Kuwait Petroleum Corporation’s 2040 strategy.

With a refining capacity of approximately 615,000 barrels per day, it accounts for 43.5% of Kuwait’s total refining capacity.

The refinery comprises three mini-refineries, each equipped with atmospheric distillation, desulfurization, and hydrotreating units, enhancing operational flexibility and continuity.



Read Today's News TODAY...
on our Telegram Channel
click here to join and receive all the latest updates t.me/thetimeskuwait






Back to top button