Site icon TimesKuwait

MEW to operate 23 substations in South Abdullah Al-Mubarak Sunday

The Ministry of Electricity, Water and Renewable Energy completed the process of connecting the main South Abdullah Al-Mubarak substation C with station B, in preparation to supply power to the area residents.

Informed sources told Al-Rai that, starting next Sunday, the ministry will operate 23 sub-stations that are supplied power by Station C, saying this is done in coordination with the Public Authority for Housing Welfare.

“The ministry has so far succeeded in operating 4 main substations in Al-Mutla’a”, say sources.

Exit mobile version