Site icon TimesKuwait

MEW declares start of last high-voltage station in Al-Mutla’a

Informed sources in the Ministry of Electricity and Water said that the transmission networks sector has pressed into service the last of the main substations in Al-Mutla’a 4Z, with a voltage of 400 kV.

The sources, according to Al-Qabas daily, added with the operation of this station, all 400 kV ultra-high-voltage stations in the Al-Mutla’a area will operate to their full capacity, which amounts to about 4,000 megawatts.

Exit mobile version