Site icon TimesKuwait

KOC extends bid deadline of USD 150 million Pipeline project

Kuwait Oil Company (KOC) extended the final deadline for submitting bids for a USD 150 million project to install pipelines for oil produced from the Umm Naqa oil field in Kuwait, to March 22, Al-Rai reported quoting from MEED magazine.

The magazine also added that the scope of work on the project includes the installation of flow lines for oil-producing wells, reinforced plastic pipelines to get rid of flowing water, the installation of hot water cocks, the installation of wellhead connections, the extension of existing heads and manifolds, a closure system for flow lines, carbon steel pipelines, pipelines, welding, and installation work.

Exit mobile version